Review

Downhole flow controllers in mitigating challenges of long reach horizontal wells: A practical outlook with case studies



Omar Jamal Chammout
  • Omar Jamal Chammout
  • Petroleum Engineering Department, Petroleum Institute, Abu Dhabi, United Arab Emirates.
  • Google Scholar
Bisweswar Ghosh
  • Bisweswar Ghosh
  • Petroleum Engineering Department, Petroleum Institute, Abu Dhabi, United Arab Emirates.
  • Google Scholar
Mohamad Yousef Alklih
  • Mohamad Yousef Alklih
  • Petroleum Engineering Department, Petroleum Institute, Abu Dhabi, United Arab Emirates.
  • Google Scholar







 Received: 26 June 2017  Accepted: 01 September 2017  Published: 31 December 2017

Copyright © 2017 Author(s) retain the copyright of this article.
This article is published under the terms of the Creative Commons Attribution License 4.0


Production and injection in long reach horizontal wells pose several challenges in production optimization, flow assurance and reservoir management. Horizontal wells are known to be superior to vertical wells in terms of productivity, however, they are also susceptible to early water and/or gas cut production due to the heel-toe effect and/or permeability contrasts. Uniform distribution of water injection into all zones can also be a challenge in case of high-permeability streaks and fractures. To negate some of the adverse reservoir properties and to control the flow profile of production and injection fluids, downhole flow control devices are increasingly in use and beneficial in regulating flow, improved overall reservoir sweep, improved productivity from the tail section of the well and reduced water coning or gas cusping. Wellbore hydraulics for a long reach well completed with downhole valves have great influence on the reservoir performance and recovery in the long run. This paper presents a discussion aimed at better understanding of the critical challenges that long reach horizontal wells are prone to in terms of completion, as well as the developments so-far that have been applied to capture the physics across the long horizontal section. Three case studies are also discussed with some details emphasizing practical experiences of such wells.
 
Key words: Downhole flow controllers, horizontal wells, inflow control devices (ICD), internal control valves (ICV), production enhancement.

Aadnoy B, Hareland G (2009). Analysis of Inflow Control Devices. Offshore Europe, Aberdeen, United Kingdom, 8-11 September. SPE-122824-MS.
Crossref

 

Al-Khelaiwi F, Davies D (2007). Inflow Control Devices: Application and Value Quantification of a Developing Technology. SPE International Oil Conference and Exhibition, Veracruz, Mexico, 27-30 June. SPE-108700-MS.
Crossref

 
 

Al-Khelaiwi F, Muradov K, Davies D, Olowoleru D (2009). Advanced Well Flow Control Technologies can Improve Well Clean-up. 8th European Formation Damage Conference, Scheveningen, The Netherlands. 27-29 May. SPE-122267-MS.
Crossref

 
 

Al-Marzouqi A, Helmy H, Keshka A, Elasmar M, Shafia S (2010). Wellbore Segmentation Using Inflow Control Devices: Design & Optimization Process. Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, United Arab Emirates, 1-4 November. SPE-137992-MS.
Crossref

 
 

Augustine J (2002). An investigation of the economic benefit of Inflow Control Devices on Horizontal Well Completions Using a Reservoir-Wellbore Coupled Model. European Petroleum Conference, Aberdeen, United Kingdom, 29-31 October. SPE 78293-MS.
Crossref

 
 

Augustine J, McIntyre A, Adam, R, Laidlaw D (2006). Increasing Oil Recovery by Preventing Early Water and Gas Breakthrough in a West Brae Horizontal Well: A Case History. SPE/DOE Symposium on Improved Oil Recovery, Tulsa, Oklahoma, USA, 22-26 April. SPE-99718-MS.
Crossref

 
 

Awad MO, Al Ajmi MF, Safar A, Rajagopalan V (2015). Advanced ICD Application Alleviating Well Intervention Challenges. SPE Kuwait Oil and Gas Show and Conference, Mishref, Kuwait, 11-14 October. SPE-175204-MS.
Crossref

 
 

Birchenko V, Muradov K, Davies D (2010). Reduction of the horizontal well's heel–toe effect with inflow control devices. J. Pet. Sci. Eng.75:244-250.
Crossref

 
 
   
 

Burtsev A, Ascanio F, Mollinger A, Kuvshinov B, De Rouffignac E (2006). Limited Entry Perforations in HVO Recovery: Injection And Production In Horizontal Wells. SPE Russian Oil and Gas Technical Conference and Exhibition, Moscow, Russia, 3-6 October. SPE-102656-MS.

 
 

Carvajal G, Saldierna N, Querales M, Thornton K, Loaiza J (2013). Coupling Reservoir and Well Completion Simulators for Intelligent Multi-Lateral Wells: Part 1. EAGE Annual Conference & Exhibition incorporating SPE Europec, London, United Kingdom, 10-13 June. SPE-164815-MS.
Crossref

 
 

Chen J, Alfred D, Shang B, Hamman J (2011). Physics-Based Permeability Modeling. SPWLA 52nd Annual Logging Symposium, Colorado Springs, Colorado, USA, 14-18 May. SPWLA-2011-TT.

 
 

Chow J, Blount C, Hilleary N (2009). Annular Isolation of Horizontal Slotted Liners with Chemical External-Casing Packers. SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, the Woodlands, Texas, 31 March-1 April. SPE-121643-MS.
Crossref

 
 

Daneshy A, Guo B, Krasnov V, Zimin S (2010). ICD Design: Revisiting Objectives and Techniques. SPE Asia Pacific Oil and Gas Conference and Exhibition, Brisbane, Queensland, Australia, 18-20 October. SPE-133234-MS.
Crossref

 
 

Edmonstone G, Jackson A, Kofoed C, Shuchart C, Troshko A (2015). Acid Systems and ICD Design Considerations For Stimulation. Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, UAE, 9-12 November. SPE-177595-MS.
Crossref

 
 

Garcia L, Coronado M, Russel R, Garcia G, Peterson F (2009). The First Passive Inflow Control Device That Maximizes Productivity During Every Phase of a Well's Life. International Petroleum Technology Conference, Doha, Qatar, 7-9 December. IPTC-13863-MS.
Crossref

 
 

Gao C, Rajeswaran T, Nakagawa E (2007). A literature review on smart well Technology. SPE Production and Operations Symposium, Oklahoma City, Oklahoma, U.S.A, 31 March-3 April. SPE-106011-MS.
Crossref

 
 

Grubert M, Wan J, Ghai S, Livescu S, Brown W, Long T (2009). Coupled Completion and Reservoir Simulation Technology for Well Performance Optimization. SPE Annual Technical Conference and Exhibition, New Orleans, USA, 4-7 October. SPE-125521-MS.
Crossref

 
 

Jackson A, Al Azizi B, Kofoed C, Shuchart C, Keller, Sau S, Grubert M, Phi M (2012). Completion and Stimulation Methodology for Long Horizontal Wells in Lower Permeability Carbonate Reservoirs. Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, UAE, 11-14 November. SPE-161527-MS.
Crossref

 
 

Jokela T (2008). Significance of Inflow Control Device (ICD) Technology in Horizontal Sand Screen Completions. Bachelor thesis at the University of Stavanger, Norway.

 
 

Jones C, Morgan Q, Beare S, Awid A, Parry K (2009). Design, Testing, Qualification and Application of Orifice Based Inflow Control Devices. International Petroleum Technology Conference, Doha, Qatar, 7-9 December. IPTC-13292-MS.
Crossref

 
 

Lauritzen J, Shahreyar N, Jacob S (2011). Selection Methodology for Passive, Active, and Hybrid Inflow Control Completions. Offshore Technology Conference, Houston, Texas, USA, 2-5 May. OTC-21910-MS.
Crossref

 
 

Maclachlan S, Harper C (2016). A Holistic Approach to Sand Control. Presented at SPE Bergen One Day Seminar, Grieghallen, Bergen, Norway, 20 April. SPE-180046-MS.
Crossref

 
 

Marir B, Allouti A, Cobb D (2011). Simulation Modeling of ICDs and MLTBs in Green Field Offshore Abu Dhabi. SPE Reservoir Characterization and Simulation, Abu Dhabi, United Arab Emirates, 9-11 Oct. SPE-148075-MS.
Crossref

 
 

Minulina P, Al-Sharif S, Zeito G, Bouchard M (2012). The Design, Implementation and Use of Inflow Control Devices for Improving the Production Performance of Horizontal Wells. SPE International Production and Operations Conference and Exhibition, Doha, Qatar, 14-16 May. SPE-157453-MS.
Crossref

 
 

Neylon K, Reiso E, Holmes J, Nesse O (2009). Modeling Well Inflow Control with Flow in Both Annulus and Tubing. SPE Reservoir Simulation Symposium, The Woodlands, Texas, USA, 2-4 February. SPE-118909-MS.
Crossref

 
 

Ouyang L (2009). Practical Consideration of an Inflow-Control Device Application for Reducing Water Production. SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, 4-7 October. SPE-124154-MS.
Crossref

 
 

Raffn A, Zeybek M, Moen T, Lauritzen J, Sunbul A, Hembling D, Majdpour A (2008). Case Histories of Improved Horizontal Well Cleanup and Sweep Efficiency with Nozzle-Based Inflow Control Devices in Sandstone and Carbonate Reservoirs. Offshore Technology Conference, Houston, Texas, USA, 5-8 May. OTC-19172-MS.
Crossref

 
 

Raffin A, Hundsnes S, Kvernstuen S, Moen T (2007). ICD Screen Technology Used To Optimize Waterflooding in Injector Well. Production and Operations Symposium, Oklahoma City, Oklahoma, U.S.A, 31 March to 3 April. SPE-106018-MS.
Crossref

 
 

Richardson J, Sangree J, Sneider R (1987). Coning. J. Petroleum Technology. 39: 08. SPE-15787-PA.

 
 

Salamy S (2005). Maximum Reservoir Contact (MRC) Wells: A New Generation of Wells for Developing Tight Reservoir Facies. SPE Distinguish Lecturer Series. SPE-108806-DL.

 
 

Shi H, Zhou H, Hu Y, He Y, Fu R, Ren B (2016). A New Method to Design and Optimize the ICD for Horizontal Wells. Offshore Technology Conference, Houston, Texas, USA, 2-5 May. OTC-26905-MS.
Crossref

 
 

Smith C, Dehghani A, Hatcher W, Mukhambetpaizov Y, Askarov B, Burg G (2016). Case Study: Kazakhstan's First Application of Inflow Control Devices ICDs for Horizontal Wells. IADC/SPE Asia Pacific Drilling Technology Conference, Singapore22-24 August. SPE-180639-MS.
Crossref

 
 

Thornton K, Soliman M, Jorquera R (2010). Optimization of Inflow Control Device Placement and Mechanical Conformance Decisions Using a New Coupled Well-Intervention Simulator. SPE Latin American and Caribbean Petroleum Engineering Conference, Lima, Peru, 1-3 December. SPE-139435-MS.
Crossref

 
 

Vasper A, Gurses S (2013). Optimized Modeling Workflows for Designing Passive Flow Control Devices in Horizontal Wells. SPE Reservoir Characterization and Simulation Conference and Exhibition, Abu Dhabi, UAE 16-18 September. SPE-166052-MS.

 
 

Wang J, Dale B, Ellison T, Benish T, Grubert M (2008). Coupled Well and Reservoir Simulation Models to Optimize Completion Design and Operations for Subsurface Control. Europec/EAGE Conference and Exhibition, Rome, Italy, 9-12 June. SPE-113635-MS.

 
 

Youl K, Harkomoyo H, Suhana W, Regulacion R, Jorgensen T (2011). Passive Inflow Control Devices and Swellable Packers Prove to Control Water Production in Fractured Carbonate Reservoir: A Comparison with Slotted Liner Completions. SPE/IADC Drilling Conference and Exhibition, Amsterdam, Netherlands, 1-3 March. SPE-140010-MS.
Crossref

 

 


APA Chammout, O. J., Ghosh, B., & Alklih, M. Y. (2017). Downhole flow controllers in mitigating challenges of long reach horizontal wells: A practical outlook with case studies. Journal of Petroleum and Gas Engineering, 8(10), 97-110.
Chicago Omar Jamal Chammout, Bisweswar Ghosh and Mohamad Yousef Alklih. "Downhole flow controllers in mitigating challenges of long reach horizontal wells: A practical outlook with case studies." Journal of Petroleum and Gas Engineering 8, no. 10 (2017): 97-110.
MLA Omar Jamal Chammout, Bisweswar Ghosh and Mohamad Yousef Alklih. "Downhole flow controllers in mitigating challenges of long reach horizontal wells: A practical outlook with case studies." Journal of Petroleum and Gas Engineering 8.10 (2017): 97-110.
   
DOI https://doi.org/10.5897/JPGE2017.0272
URL http://academicjournals.org/journal/JPGE/article-abstract/8CAB31267072

Subscription Form