Journal of
Petroleum and Gas Engineering

  • Abbreviation: J. Petroleum Gas Eng.
  • Language: English
  • ISSN: 2141-2677
  • DOI: 10.5897/JPGE
  • Start Year: 2010
  • Published Articles: 113

Full Length Research Paper

Dynamic simulation of the unloading process of gas-lift hard lifts in the Kelameili Water-Flooded Gas Well

Zhong Haiquan
  • Zhong Haiquan
  • State Key Laboratory of Oil/Gas Reservoir Geology and Exploitation, Southwest Petroleum University, China.
  • Google Scholar
Zhang Feng
  • Zhang Feng
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar
Feng Dianfang
  • Feng Dianfang
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar
Wang Xiaolei
  • Wang Xiaolei
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar
Wang Zhengming
  • Wang Zhengming
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar
Hong Jiangling
  • Hong Jiangling
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar
Chen Wei
  • Chen Wei
  • No.1 Gas Recovery Plant, Xinjiang Oilfield Company, CNPC, Xinjiang Karamay, China.
  • Google Scholar


  •  Received: 01 July 2017
  •  Accepted: 20 October 2017
  •  Published: 30 November 2017

References

Capucci EC, Serra KV (1991). Transient aspects of unloading oil wells through gas-lift valves. SPE-22791-MS, SPE Annual Technical Conference and Exhibition, 6-9 October, Dallas, Texas.
Crossref

 

Hagedorn AR, Brown KE (1965). Experimental study of pressure gradients occurring during continuous two-phase flow in small-diameter vertical conduits. J. Petrol. Technol. 17(04):475-484.
Crossref

 
 

Jia YL, Tian W, Yang YC, Cheng DJ, Bai XH (2013). Calculation method of gas lift mode selection for put back on production of watered gas well. Drilling Prod. Technol. 36(1):33-35.

 
 

Li XQ (2006). Simulations of the unloading process of continuous gas lift in Zhong Yuan Oilfield. Southwest Petroleum University, 2006.

 
 

Liao RQ, Liu SW, Wang QS, Wang H (2003). The dynamic simulation of the gas-lift unloading. J. Basic Sci. Eng.11 (1):46-52.

 
 

Tang FP, Liu H, Zhao LP, Liu DQ, Zhang F, Ma ZH (2010). Technology of gas production in the Kelameili Gas Field. Nat. Gas Ind. 30(2):61-62.

 
 

Tang YL, Schmidt Z, Blais R(1997). Transient dynamic characteristics of the gas-lift unloading process. SPE-38814-MS, SPE Annual Technical Conference and Exhibition, 5-8 October, San Antonio, Texas.
Crossref

 
 

Wang L (2016). Design and application of multi-well gas lift in water-flooded gas well. Oil Field Equipment 45(5):64-68.

 
 

Wang Y,Chen J,Li B,Jiang H,Wang XP (2014). Water-producing features of volcanic gas reservoirs in dixi 18 well block. Nat. Gas Explor. Dev. 36(2):48-52.

 
 

Zhang XC (2006). Continuous gas lifts optimization gas allocation and unloading simulation technology. China University of Geosciences (Beijing).