Scientific Research and Essays

  • Abbreviation: Sci. Res. Essays
  • Language: English
  • ISSN: 1992-2248
  • DOI: 10.5897/SRE
  • Start Year: 2006
  • Published Articles: 2769

Full Length Research Paper

Grouting applications of grout curtains in Cindere dam and hydroelectric power plant

Devrim ALKAYA*
  • Devrim ALKAYA*
  • Department of Civil Engineering, Faculty of Engineering, Pamukkale University, Denizli, Turkey.
  • Google Scholar
Burak YEŞİL
  • Burak YEŞİL
  • Department of Civil Engineering, Faculty of Engineering, Pamukkale University, Denizli, Turkey.
  • Google Scholar


  •  Received: 13 January 2011
  •  Accepted: 09 May 2011
  •  Published: 08 September 2011

Abstract

Grouting is one of the most popular methods used to control water leaking in fill dam constructions. Geological and geotechnical properties of the rock/soil to be grouted are important parameters influencing the design of the grouting. In this study, geotechnical properties of Cindere dam’s base rock and the grouting procedure have been investigating view of suitability to grouting. Detailed investigations of the foundation injection applications made into the main rock, the reasons and types of application are made. The materials used in grouting and the grouting pressures are investigated at site and the obtained results are presented. The improvement study and application type is evaluated and background information on different applications of grouting is presented.

 

Key words: Grouting dam, Cindere dam, imperviousness.