Full Length Research Paper

Developing petri net model and meta-heuristic algorithms for cyclic scheduling in 2-machine robotic cells

Mohammad Fathian1, Isa Nakhai Kamalabadi2, Mehdi Heydari1, Hiwa Farughi1* and Foruzan Naseri3
1Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran. 2Industrial Engineering Department, Tarbiat Modares University, Tehran, Iran. 3Industrial Engineering Department, University of Kurdistan, Sanandaj, Iran.
Email: [email protected]

  •  Accepted: 14 December 2011
  •  Published: 18 April 2012

Abstract

In this paper, the cyclic scheduling problems in 2-machine robotic cells have been studied. We investigated the timed Petri network graph for modeling the part sequencing and the optimal robot moves sequence in robotic manufacturing cells. The robotic manufacturing cell considered in this study has two identical machines and one single gripper robot. Also, we have assumed that the manufacturing cell is capable of producing identical and different parts. The main objective of this study is to minimize the cycle time. To solve this problem, we have proposed two meta-heuristic algorithms called particle swarm optimization (PSO) and simulated annealing (SA) and compared the obtained results with the exact solutions by LINGO. Also the complexity of the proposed model has been analyzed.

 

Key words: Cycle time, 2-machine robotic cell, Petri net, part sequencing, robot moves sequence, cyclic scheduling, meta-heuristic algorithms.