Simulation of risk based on ending activeness of the project plan

  Dusko Letic, Branko Davidovic, Eleonora Desnica and Ivana Berkovic    
University of Novi Sad, Technical Faculty M. Pupin, 23000 Zrenjanin, Serbia.
Email: [email protected]

  •  Accepted: 29 December 2011
  •  Published: 31 March 2013

Abstract

 

This work presents the results of the theoretical-experimental researches of the quantification for the superponed flow time of the two local-autonomous flows in the net of the basic Clark’s equations. The computer solution to this basic variant of the general flow model through the net is performed by the methods of the numerical simulation (Monte Carlo), supplemented by frames’ method. The numerical experiment is realized by the program tool Mathcad Professional.

 

Key word: Mathematical model, simulation, project plan.